solarVis Product Updates — February 2025
Project location editing, inverter capacity limits, automatic material compatibility checks, volume-based heat pump calculations, transparent system losses, and new dealer-specific settings.
Project Location Update
Modify the location of existing projects without restrictions — addressing a long-standing limitation flagged by customer feedback.
Inverter Limitation
Set inverter capacity limits for more precise project designs. Automatic violation checking fires whenever power exceeds the threshold.
Material Compatibility Check
Automatic verification based on project type — on-grid, off-grid, hybrid — and battery usage, catching invalid combinations before they reach the proposal.
Heat Pump Volume Calculation
Heat pump sizing shifted from area-based to volume-based calculations for significantly better accuracy.
System Loss Transparency
Estimated system losses now display directly in proposals, giving customers honest production estimates instead of black-box numbers.
Proposal Title Editing
Update proposal titles directly from the cover page — no detour through project settings.
New Appliance Module
Improved appliance integration for off-grid energy systems, making load modeling more realistic.
Per-Panel Pricing
Pricing is now available on a per-panel basis for construction and custom bill of material items.
Dealer-Specific Settings
Dealers can customize proposal settings independently when granted permission — important for franchise-style networks.
BOM Autosave Improvements
Stability fixes addressing autosave errors in Bill of Materials.
Originally published on: LinkedIn