Zero Export
Zero export is a grid-connected solar setup that is controlled so it never sends power into the grid. A meter at the connection point tells the inverter how much the building is drawing, and the inverter limits its output to that level, so every kWh produced is used on site or stored.
A zero-export system is connected to the grid but never sends energy into it. It still draws from the grid whenever the building needs more than the solar system produces. What it never does is push its surplus out.
A meter closes the loop. A power meter or current transformer at the connection point measures the building's net flow many times a second. The inverter, or a dedicated power controller for several inverters, reads that value and throttles its output so production never exceeds what the building is using at that moment.
It is a grid and contract decision. Installers choose zero export when the local network cannot take more generation, when an exporting connection would need a longer application or grid reinforcement, or when exported energy is worth little or nothing. A partial version, export limitation, caps export at a set level instead of zero.
The cost is curtailment. Whenever the building uses less than the array could produce, the surplus is not generated. On a weekend in an office or at midday in an empty home that can be a large share of the output. Sizing the array to the load, shifting flexible loads into the solar hours and adding a battery all reduce it.
Why it matters for solar installers
On a zero-export project the savings come only from what the building uses, so the array size and the battery have to be matched to the hourly load. SolarVis offers zero injection as a grid connection type alongside on-grid and off-grid, simulates production against the hourly consumption, and models a battery to recover the surplus. See battery modeling.
Common questions
- Why would a solar system be set to zero export?
- Because the grid connection does not allow export, because the export approval would take too long or cost too much, or because exported energy earns nothing. Some network operators accept a zero-export system with a simpler review than an exporting one, and in some markets it avoids a feed-in contract altogether.
- How does zero export work technically?
- A power meter or current sensor at the grid connection point measures the building's net flow in real time. The inverter, or a separate power controller, reads it and reduces its output whenever production would otherwise exceed consumption, so the net flow never turns toward the grid.
- Does zero export waste solar energy?
- It can. When the building uses less than the array could produce, the inverter curtails the surplus and that energy is lost. A battery, flexible loads scheduled into the solar hours and an array sized to the load all reduce curtailment.