Solar tariffs and regulations in France

Obligation d'Achat, Tarif Bleu and the professional C5 to C1 tariffs. France fixes the surplus tariff for 20 years at commissioning, so the date a project connects decides its revenue for two decades.

02

Every market, every tariff, built in

Net metering, net billing, credit carry-over, feed-in tariffs and hourly or monthly netting all live in the tariff configurator, alongside time-of-use, tiered and demand charge structures. Tune currency, seasons, export rates and VAT, or build a brand-new tariff structure when a market changes the rules. Pre-built for the US, UK, Germany, Türkiye, South Africa, Italy, Spain, France, Poland and the Netherlands.

  • Net metering, net billing, and credit carryover
  • Time-of-use, tiered, and demand charge structures
  • Per-country currency, seasons, and export terms
Open the tariff configurator docs
Browse by country
01 / 04

Obligation d'Achat (EDF OA)

Surplus is sold under a purchase obligation at a regulated tariff, fixed for 20 years from commissioning. The tariff in force on the connection date is the one the project keeps for its whole contract, which makes the connection date a commercial variable rather than an administrative one.

02 / 04

Support has been cut repeatedly since 2025

Both the surplus tariff and the self-consumption premium for small systems have been reduced several times since 2025. Confirm the applicable value against the current CRE publication before it goes into a proposal, and never carry a rate forward from an older quote.

03 / 04

Tarif Bleu Base and Heures Pleines / Heures Creuses

Residential supplies run at 6 or 9 kVA on either a flat Base rate or an HP/HC split with off-peak hours overnight. Choosing between the two and sizing a battery are the same decision, because the value of stored energy is the gap between the two rates.

04 / 04

Professional tariffs C5 to C1

C5 Bleu Pro follows Base or HP/HC, C4 adds four seasonal periods, and C3, C2 and C1 run five periods including the winter peak in the morning and early evening. All of them carry power charges, so contracted power has to be modelled alongside energy.

01How long is the French surplus tariff fixed for?+

Twenty years from commissioning. The rate that applies on the connection date is locked for the whole contract, so two otherwise identical projects connected in different quarters can earn materially different revenue over their lifetime.

02Can I reuse the tariff from my last proposal?+

No. French support levels have been cut several times since 2025 and the reductions have been significant, so a rate copied from an earlier quote is likely to be wrong. Check the current CRE publication for each project and enter the confirmed value.

03Does solarVis model HP/HC and the seasonal periods?+

Yes. Ten French tariffs are preloaded, covering residential Base and HP/HC at 6 and 9 kVA, C5 Bleu Pro, the four seasonal periods of C4 and the five periods of C3, C2 and C1, along with their power charges.

04Why does contracted power matter in France?+

Because from C4 upwards the bill carries a power charge that generation does not reduce. A design that lowers energy consumption without addressing the site's peak leaves a large part of the bill untouched, and the customer notices that on the first invoice.

Get started

See solarVis in action

We use cookies to improve solarVis

Necessary cookies keep the site running. Analytics and marketing cookies show us which pages actually help installers and let us measure our ads. We enable analytics and marketing cookies by default to improve this site and measure our ads. You can opt out anytime. Read our Cookie Policy